EN 50126-3 PDF

Supersedes CLC/TR English version. Railway applications –. The specification and demonstration of. Reliability, Availability. BS PD CLC/TR Railway applications – The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) – Part 3. Buy CLC/TR Railway Applications – The Specification And Demonstration Of Reliability, Availability, Maintainability And Safety (rams) – Part 3.

Author: Nami Nijora
Country: Nicaragua
Language: English (Spanish)
Genre: Life
Published (Last): 11 August 2009
Pages: 402
PDF File Size: 19.87 Mb
ePub File Size: 10.44 Mb
ISBN: 447-6-73721-182-1
Downloads: 77027
Price: Free* [*Free Regsitration Required]
Uploader: Faezil

Accept and continue Learn more about the cookies we use and how to change your settings. The number of journeys running to schedule can be determined by the difference between the total number of scheduled journeys and the number of journeys not running to schedule due to rolling stock related causes. The BSI copyright notice displayed in this document indicates when the document was last issued.

Dynabrade Product – 3″ (76 mm) Dia. Disc Pad, Hook ‘N Loop

Based on Annexes A and C of ENavailability A of a rolling stock is specified as the time for which a rolling stock is in a state to perform its mission. TR – 3. During this phase the Main Supplier should also collect detailed analyses carried out by sub contractors in order to: These standards include the generic safety norm IEC Maintenance cost is time-variable when considering either corrective or preventive maintenance.

TOP Related Articles  MEDICINA PREVENTIVA Y SALUD PUBLICA PIEDROLA GIL EBOOK

Items contained 05126-3 each of these are listed below: SF to LA in under 3 hours by The frequency time or Km under analysis has to be indicated in the header.

BSpdf – Free Download PDF

A minimum set of data is used to represent and to m anage the breakdown structure. There are two categories of structures to support RAM analyses: Systems approach to safety, EN 501226-3 3: Guide to application of.

Get a quote for certification of systems, products or services, and get certified.

What is RAMS about? Search all products by. This clause gives detailed information on phases 1, 2, 4 and 5 of system life cycle requirements described in 6. Final Design Review This design process milestone is to check that design has progressed to completion.

However, it provides, only as an example, typical data and document templates for recording the output of a RAM analysis.

AFNOR Editions Online Store

NOTE If it is not possible to measure time to reach maintenance site or to plan maintenance actions, contractual fixed times can be used.

Evaluation of removability of an item should also take into account the possible need for removing parts of the rolling stock structure e.

Railway applications — The specification and demonstration. Tables 5 to 7 show the specifications for each Failure Category.

Following this simple outline, the derivation of detailed sub-categories and costs can be easily carried out and so it makes modelling of LCC possible. Identifying, as part of the RAM analysis process preliminary and detailed analysiscritical scenarios i. Build your compilation Add to a compilation Add to a compilation create a compilation without subscription wuthout subscription with subscription Build a watch list Add to the watch list.

TOP Related Articles  CACTI 0.8 NETWORK MONITORING PDF

When choosing the checking period, it is important to highlight that: Compliance with a Published Document does not of itself confer immunity from legal obligations. At each level identified in the hierarchy, every system identified becomes the next system under consideration and can be further decomposed into lower levels, as necessary.

In this case two choices may be considered for addressing the target of minimising standstill time: In particular as regards passenger vehicles and environments, textile coverings that can be cleaned efficiently should be used.

This should be considered to ensure that maintenance costs from different operators or from different rolling stock Main Supplier are compared on the same equal basis.

We need your help to maintenance this website. Corrective maintenance is larger for older rolling stocks than new ones, once the early failure period of new ne stock has been overcome.

Your basket is empty.